Project
In a very short timeframe we completed the engineering of the design, the construction and the fittings and a budget for a project undertaking in Libya. By a short term meeting with the involved three parties and opening the project for development, we were able make an offer in a matter of weeks. Because of the often high local temperatures we included under-floor heating and cooling in our plan, and ceiling cooling through the use of active core action.
On location
In order to test our plans we were invited on location in Tripoli and were able to assess the land, culture and project locally. At the same time we also saw the plans and location for the ‘Sea Resort’ development. The full engineering for the project has yet to take place.
client
BSIprocess stage
- engineering
project type
exterieur en interieur bestaande en nieuwbouwfloor area
1.000-5.000 sqmhanding over
2009collaborations
- Bergers Interieurs
- Royal Haskoning
- Snelbouw groep




process